Testing the Load (Available in Geoenvironmental Engineering Special Issue only)
The Pittsburgh District of the U.S. Army Corps of Engineers recently began construction of a new gated dam to replace a nearly 100-year-old concrete fixed-crest dam on the Monongahela...

The Final Connection
In 1969, New York City Transit (NYCT) began construction of a new subway to link Manhattan to east Queens. But funding issues prevented this 63rd Street Line from being completed as planned...

Historical Sediment Budget Analysis of the Malibu Coastline
Sediment supply to the Malibu coastline has been continually decreasing since development began in the Santa Monica Mountains in the 1880's due to dam construction for irrigation and recreation,...

Making Way for Runways
New runway construction at major U.S. airports is not only about landing more airplanes, it's about moving communities, spanning or moving interstate highways, and hauling...

Wireless Warnings
Formwork failures cause dozens of construction-related deaths per year, but most can be avoided by adequate monitoring. The problem is, most monitors must be hard-wired to a computer on...

Tight Squeeze
The Newark, New Jersey Route 21 Viaduct Replacement is a massive, $250 million highway improvement program being undertaken by the New Jersey Department of Transportation. Michael Baker...

Sinking a Sewer Line
The design and construction of a sanitary sewer siphon using high density polyethylene (HDPE) pipe in San Juan, Puerto Rico, provided Black & Veatch with a challenging opportunity...

Replacing the East Bay Bridge
The seismically vulnerable East Span of the San Francisco-Oakland Bay Bridge will be replaced with a dual eastbound and westbound, 3.6-km-long structure. The cost of the replacement bridge...

Easing the Way for E-Permitting
In an effort to speed the development of an electronic permitting process in Fairfax County, Virginia, the firm Dewberry & Davis conducted a forum as part of a kickoff process....

Building Code Requirements for Masonry Structures (ACI 530-99/ ASCE 5-99/TMS 402-99), Specification for Masonry Structures (ACI 530.1-99/ ASCE 6-99/TMS 602-99), Commentary on Building Code Requirements for Masonry Structures, Commentary on Specification for Masonry Structures
Building Code Requirements for Masonry Structures (ACI 530-99/ASCE 5-99/TMS 402-99), Specification for Masonry Structures (ACI 530.1-99/ASCE 6-99/TMS 602-99), Commentary on Building Code...

Rapid Expansion
Dallas Area Rapid Transit (DART) is undertaking an ambitious light-rail expansion program. It already operates a 20 mi (32 km) light-rail starter system in the city of Dallas. Under construction...

Safeguarding Los Alamos
A forest fire that burned 48,000 ac (19,500 ha) around the Los Alamos National Laboratory, in New Mexico, in May 2000, created another problem for one of the nation's most...

Examining the Capitol Dome
The dome of the United States Capitol, designed and built from the 1850s to the 1860s, is a masterpiece of 19th-century engineering and construction. The majority of the dome is made of...

Quality in the Constructed Project
A Guide for Owners, Designers, and Constructors
This Second Edition of Quality in the Constructed Project: A Guide for Owners, Designers, and Constructors (ASCE Manual No. 73) provides information...

Emerging Materials for Civil Infrastructure
State of the Art
Prepared by the Emerging Materials Committee of the Materials Division of ASCE. This report presents a review of the state of the art on emerging materials...

The Construction Challenges
The varied SPRP construction and construction management complexities of the new South Pole are even more challenging because summer work must be carried out within a compressed window...

Phase II Evaluation Findings
The Segmental Concrete Channel Bridge System
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF Innovation Center. This report represents the second component of the...

Battling Concrete Corrosion
For decades engineers have fought concrete corrosion, but few methods have offered a long-term solution�until now. Electrochemical techniques such as electrochemical chloride extraction...

Best of Both Worlds
All around the Pacific Rim structural engineers are experimenting with concrete filled steel tubes as structural elements. The concrete filled tubes take advantage of the best properties...

Rebuilding a Railroad Bridge
The Peck Movable Bridge and Bridgeport Viaduct is a four-track crossing in Connecticut that serves three rail lines. The 1904 bridge had deteriorated, causing a kink that forced trains...

 

 

 

 

Return to search